Seamless Steel Pipe(SMLS Pipe)
- Model
- ytdr-Seamless Steel Pipe
Item specifics
- Certification
- ISO/CE/ASTM/AS
- Delivery time
- 7-30 days
- Tolerance
- as required
- Place of origin
- China
- Thickness
- 2mm-50mm
- Length
- 0.5-24m or as required
- Diameter
- Φ:21.3mm-914mm
- Standard
- API 5L ASTM A106/A53/A500/A501 EN10210/10219
- Grade
- X42/52/60/65/70 Gr.A/B/C,S275/355/235/420/460
- Supply capacity
- Annual output of 5 million tons
Review
Description
Seamless Steel Pipe(SMLS Pipe)
CS seamless pipe Sizes:
Maximum diameter: 36" (914.4mm) minimum diameter: 1/4" (10.3mm)
Maximum thickness: 60mm mininmum thickness: 2.11mm
SCH: SCH10,SCH20,STD,SCH40,SCH60,XS,SCH80,SCH100,SCH120,SCH160,XXS
Standard of carbon seamless steel pipe
Chemical components & mechanical properties
Classfication of carbon seamless steel pipe
Tolerances of carbon seamless steel pipe
Uses:
Petroleum cracking pipe,Boiler and superheated steam pipe,Boiler Tube,Mechanical structure pipe,Automobile half axle sleeve,Ship pipe,Geological drilling pipe,petroleum pipe,line pipe,Water pipe,Natural gas pipeline,Container tube
Mechanical properties of seamless pipes
Strict product inspection
Each steel pipe must pass the inspection layer by layer. Only the products that pass the inspection can leave the factory. Never let an unqualified product flow into the market
Seamless steel pipe coating:
3PE
|
3PP
|
FBE Coating
|
Epoxy Coating
|
Special Painting
|
Galvanization
|
Oiling
|
Painting
|
Bare
|
Galvanized aluminum magnesium
|
anticorrosive
|
Black seamless pipe production cycle:
Under normal conditions,3-30 days,It also depends on the quantity and difficulty of production.Can communicate with the account manager.Contact Us now!
Seamless steel pipe Delivery cycle
Southeast Asia generally takes 15 days, South Africa takes 45 days, the Middle East takes 30 days, Europe takes 45 days, Japan takes 5 days, India takes 30 days, North America takes 30 days, Russia's Far East takes 7 days, and South Korea takes 5 days